INSTALLATION INSTRUCTIONS
58
September 1995 – 981088
Section 10: Setting the Developer Temperature
[1] Insert a calibrated THERMOMETER TL-1582 into the DEVELOPER TANK and measure the temperature of
the developer solution.
(a) If the temperature is 33.9
°
C
±
0.3
°
C (93
°
F
±
1
⁄
2
°
F), go to section “Checking and Adjusting the
Replenishment Rates” on Page 60.
(b) If the temperature is not 33.9
°
C
±
0.3
°
C (93
°
F
±
1
⁄
2
°
F), continue with this procedure.
Possible damage from electrostatic discharge.
ESD
[2] Pull out the SUPPORT SHELF for the ELECTRICAL BOX from the drive side of the PROCESSOR.
[3] Pull out the ELECTRICAL BOX.
[4] Connect your ESD protective wrist strap into the ESD JACK on the ELECTRICAL BOX.
[5] Open the COVER of the ELECTRICAL BOX. Fasten the COVER open by placing the O-RING, that is on the
PROCESSOR TANK, around the POST on the COVER.
Figure 50
Pulling Out the ELECTRICAL BOX
H130_0143HA
BOX
ELECTRICAL
SUPPORT SHELF
ELECTRICAL
BOX
JACK
O-RING
POST
COVER
100 CIRCUIT BOARD
H130_0143HCA
ESD