INSTALLATION INSTRUCTIONS
20
September 1995 – 981088
Important
Read the following steps carefully. Determine whether you need to route the REPLENISHMENT HOSES and the
POWER CABLE through the darkroom wall. Do only the steps that are appropriate for your installation
requirements. It is not recommended to route the POWER CABLE through the wall.
[26] Route the developer REPLENISHMENT HOSE, identified by the red WIRE TIE, through the hole under the
developer DRAIN VALVE.
[27] Route the fixer REPLENISHMENT HOSE, identified by the blue WIRE TIE, through the hole under the fixer
DRAIN VALVE.
[28] Position a SPACER on the TOP of the MOUNTING STAND under each of the 2 LEVELING FEET.
[29] Position a EYEBOLT over each SPACER. See the figure for the correct orientation of the EYEBOLTS.
Figure 15
Installing the EYEBOLTS
[30] Lower the raised end of the PROCESSOR by removing the piece of wood supporting it.
[31] Check that the LEVELING FEET are lowered into the SPACERS.
[32] Align the 2 LEVELING FEET and SPACERS with the holes in the TOP of the MOUNTING STAND. Position
the LEVELING FEET through the holes.
[33] Install the following parts onto the 4 LEVELING FEET by reaching under the TOP of the MOUNTING
STAND:
• 4 WASHERS, provided with the MOUNTING STAND
• 4 NUTS, removed in Steps 11 and 20
H130_0183HA
H130_0183HCA
WASHER (4)
NUT (4)
SPACER (2)
support
FOOT (2)
LEVELING
wood
EYEBOLT (2)
STAND
MOUNTING