Checking and Adjusting the Replenishment Rates
981088 – September 1995
63
[18] Compare the ratio you obtained to the recommended ratio listed in the Replenishment Rate Sheet, Publication
Number 1C0578, located in the front pocket of your publications binder.
(a) If the ratio is not correct, see section “Adjusting the Fixer to Developer Replenishment Rate Ratio” in the
Service Manual, Publication Number 981090.
[19] De-energize the PROCESSOR by moving the MAIN CIRCUIT BREAKER CB1 to the “O” position.
Caution
The PROCESSOR must be de-energized before you drain the TANKS.
[20] Drain the water from the 3 TANKS by rotating the DRAIN VALVE STEMS
1
⁄
4
turn.
[21] When the TANKS are drained, close the DRAIN VALVES by pushing in the DRAIN VALVE STEMS and
rotating them
1
⁄
4
turn.
Figure 54
Closing the DRAIN VALVES
[22] Dry the DEVELOPER TANK first, and then the FIXER TANK by wiping the TANKS with a clean, lint-free
towel.
[23] If you are installing the PROCESSOR through the darkroom wall, go to section “Filling the TANKS” on
Page 67. If not, go to section “Installing the KNOBS” on Page 64.
H130_0145BA
DRAIN VALVE STEMS
H130_0145BCA