INSTALLATION INSTRUCTIONS
30
September 1995 – 981088
Connecting the REPLENISHMENT HOSES
Note
• The developer REPLENISHMENT HOSE has a red WIRE TIE for easy identification.
• The fixer REPLENISHMENT HOSE has a blue WIRE TIE for easy identification.
[78] Use the parts from the THROUGH-THE-WALL KIT listed below to route the REPLENISHMENT HOSES to
the REPLENISHMENT TANKS in the darkroom.
• 2 clear REPLENISHMENT HOSES -
3
⁄
8
in. ID (not provided in the THROUGH-THE-WALL KIT)
• 2 REPLENISHMENT HOSE FITTINGS -
3
⁄
8
in. Barbed
• 2 REPLENISHMENT HOSE CLAMPS -
1
⁄
2
in.
[79] Check that the STRAINER ASSEMBLIES are installed in the REPLENISHMENT HOSES near the
REPLENISHMENT TANKS.
Routing the DRAIN HOSES
Warning
• DRAINS must be made of chemically resistant, non-corrosive material. Use CPVC or equivalent.
• The DRAIN must have a minimum diameter of 7.6 cm (3 in.) and be free of obstruction.
• The DRAIN must have a capacity of 10 litres/min (1.3 gal/min).
• DRAIN service must comply with local codes.
• Local codes must be consulted to determine which solutions, if any, can be drained directly into the building
system.
• The PROCESSOR provides a water gap of 5.1 cm (2 in.)
[80] Locate the opaque DRAIN HOSES coming through the WOOD FRAME.
[81] Connect the parts from the THROUGH-THE-WALL KIT listed below to route the DRAIN HOSES to either
the DRAIN or to the SILVER RECOVERY UNIT:
• 3 clear DRAIN HOSES -
3
⁄
4
in. ID (provided with the M43 and M43A PROCESSORS and in the Clinic 1
INSTALLATION KIT)
• 3 DRAIN HOSE FITTINGS -
3
⁄
4
in. Barbed
• 6 DRAIN HOSE CLAMPS #12 -
3
⁄
4
in.
[82] Check that all the DRAIN HOSES slope continuously downward to the DRAIN to provide for proper drainage.
In particular, check that the section of DRAIN HOSE extending from the DRAIN VALVE on the light side of
the PROCESSOR through the wall of the darkroom slopes downward continuously.
Note
Fittings for connecting a SILVER RECOVERY UNIT are not provided with the PROCESSOR nor in the
THROUGH-THE-WALL KIT.