INSTALLATION INSTRUCTIONS
54
September 1995 – 981088
Section 9: Doing the Water Leak Test
[1] If SEISMIC BRACKETS are needed and if the PROCESSOR is in its final position, install the SEISMIC
BRACKETS at this time. See the instructions provided with the SEISMIC BRACKET KIT 261413.
[2] Check that all 3 DRAIN VALVES are closed.
[3] Fill the FIXER and DEVELOPER TANKS with water until the level of the water is at the OVERFLOW
WEIRS. Water will go down the DRAIN LINES when the TANKS are full.
Caution
To prevent spills or splashes into other TANKS or onto electrical parts:
• Check that the SIDE ACCESS PANELS are installed.
• Pour the water into the TANK at the non-drive end of the PROCESSOR.
• Do not pour water onto the RACKS.
Figure 46
Filling the TANKS for the Water Leak Test
H130_0152HA
H130_0152HCA
DEVELOPER
TANK
OVERFLOW
FIXER TANK
WEIRS