background image

 

 

  

Technical Manual

Kingspan SHE Control Panel TRZ Plus 

2A and TRZ Plus Comfort

12/24999513

Safety Instructions 

Documentation: 

This documentation is exclusively 

valid for the product or product range as stated in the 
type designation on the cover and must be applied 
comprehensively. This technical documentation must be read 
carefully before installation. Follow the guidelines. Contact 
the manufacturer if you have any questions or problems. This 
documentation should be retained for future reference.

User:

 This documentation is aimed at trained, professional 

electricians with safety awareness, who are familiar with 
mechanical and electrical equipment installation, accident 
prevention regulations and industrial compensation laws, 
and contains important information for operators and users.

Please observe the following safety instructions which are 
emphasized by special symbols.

 

Caution:

 Danger to persons due to electricity.

 Attention:

 Danger to persons due to risks arising  

 

from the operation of the equipment. Danger of  

 

crushing/trapping.

 Warning:

 Non-observance leads to destruction.  

 

Danger to material due to incorrect handling.

 

Important information

 

Use according to regulations:

 The product may  

 

 only be used for the functions and applications 
detailed, and in accordance with the 
accompanying documentation. Unauthorised 
electrical and mechanical modifications are not 
permitted and will invalidate warranty and liability.

Transport and storage:

 The product may only be 

transported and stored in its original packaging. It must not 
be knocked, dropped, or exposed to moisture, aggressive 
vapours or harmful environments. More detailed transport 
and storage instructions provided by the manufacturer must 
be observed.

Installation:

 Installation and assembly may only be carried 

out by trained professional electricians, in accordance with 
the recognised rules of engineering as well as the technical 
documentation provided here. This will guarantee that 
the product will function safely during operation. Care 
should be taken that all mechanical components are fixed. 
Immediately after installation the electrical and mechanical 
components should be checked to ensure that they function 
correctly, and the tests and the results thereof should be 
documented.

Operation:

 Safe operation is guaranteed if the acceptable 

rated values and guidelines regarding maintenance 
information stated in this documentation, as well as 
supplementary information provided by the manufacturer, 
are followed.

Malfunction:

 If a malfunction is identified in the course of 

installation, maintenance, inspection etc., immediate action 
should be taken to rectify the problem.

Repair and maintenance:

 Defective equipment must 

only be repaired by the manufacturer, or by companies 
authorised by the manufacturer. Only original spare 
parts may be used. Repairs may only be carried out by 
trained professional electricians, in accordance with the 
recognised rules of engineering as well as the technical 
documentation provided here and supplementary advice 
from the manufacturer. This will guarantee that the product 
will function safely during operation. Care should be taken 
that all mechanical components are fixed. Immediately after 
repair the electrical and mechanical components should be 
checked to ensure that they function correctly, and the tests 
and the results thereof should be documented.

Maintenance:

 If the product is used as part of a safety 

system such as a smoke and heat extraction system (SHE), 
it must be tested, maintained and if necessary repaired at 
least once a year as specified by the manufacturer or in 
line with EN 18232-2 Smoke and heat control systems for 
instance and The Regulatory Reform (Fire Safety) Order 
2005. This is also recommended for systems used purely 
for ventilation. If the product is to be used in other safety 
systems, shorter maintenance intervals may be necessary. 
With systems composed of control units, opening devices, 
controlsections etc., all components that interact directly 
with each other are to be included in maintenance.
Maintenance must be carried out comprehensively following 
the manufacturer guidelines and the accompanying 
documentation. Components requiring maintenance must 
be accessible. Defective equipment must only be repaired 
by the manufacturer, or by companies authorised by the 
manufacturer. Only original spare parts may be used. All 
components that have a specified maximum operation time 
(such as batteries) must be replaced within this time (see 
technical specification) with original parts or manufacturer-
approved parts. Regular inspection is necessary to ensure 
that the equipment is ready for operation. A maintenance 
contract with a recognised contractor is recommended.

Содержание Compact Control Panel 2A

Страница 1: ...Kingspan SHE Control Panel TRZ Plus 2A and TRZ Plus Comfort Technical Manual Compact Control Panel 2A and Compact Control Panel 2A M Light Air UK Republic of Ireland ...

Страница 2: ...ch 14 Connecting Diagram SHE manual Call Point 15 Connecting Diagram Smoke Detector 16 Connecting Diagram Fire Alarm System 17 Connecting Buzzer Signal Lamp 18 Connecting Diagram Wind Rain Detector 19 Connecting Diagram Potential Free Contacts 19 Connecting Selector Switch Manual Automatic Temperature Sensor and Vent Switch 20 Connecting Multisensor for Measurement of Humidity CO2 Quality ppm and ...

Страница 3: ...on alarm Separately fused power input 230V AC 50 Hz Hinged door or cover lockable Conforms to current state of the art standards Processor controlled Versatile connection facilities Service port interface included TÜV type tested Tested according to EN 12101 10 Scope of Delivery 1 x SHE control panel 1 x rechargeable batteries 2 x velcro tapes for fastening the batteries Compact Control panel 2A 2...

Страница 4: ...nted Operation Safe operation is guaranteed if the acceptable rated values and guidelines regarding maintenance information stated in this documentation as well as supplementary information provided by the manufacturer are followed Malfunction If a malfunction is identified in the course of installation maintenance inspection etc immediate action should be taken to rectify the problem Repair and m...

Страница 5: ...e burglary and attack alarm systems If necessary cable types must be defined in conjunction with the local approval bodies power supply companies or fire safety authorities Cabling for extra low voltages e g 24V DC is to be laid separately from low voltage line e g 230V AC Flexible cables must be laid in such a way that they cannot be sheared off twisted or snapped during operation Power supplies ...

Страница 6: ... must be routed separately from the mains supply lead When routing the cables please observe the corresponding VDE regulations with expansion via additional printed circuit board TRZ WRMAS Basic by TRZ Plus Comfort Seren 24 V AC DC 100 mA Cable type see chapter cable length diagram Protective conductor cable may NOT be used Observe VDE regulations Either magnetic locking 24 V DC or linear drives j...

Страница 7: ...If automatic detectors are connected only Smoke heat extraction opening windows Smoke reaches the automatic detectors the windows are opened completely the red display in the automatic detector is shining the red LED display SHE activated is shining at all SHE manual call points the ventilation function is out of order Smoke heat extraction closing windows Press the switch Closed at a SHE manual c...

Страница 8: ...ay or there is no ventilation button in the door of the TRZ Plus Comfort the stroke limit setting must be made through the optional service port software Note In case of mains or battery failure or SHE activation the function is out of order In case of mains or battery failure the windows close immediately LED Display In the SHE control panel and SHE manual call points The green LED display OK ope...

Страница 9: ... factor made up from 2 5V max permissible voltage drop and electrical conductivity of copper ggf Aufschlagin xL m 73 adingfactorin xL m 73 A mm I A x L m 73 M M simple cabel length L Notes re selection of cables For the motor supply cables of SHE drives 3 or 5 duplicated layout individual cores are required Two cores 4 cores are for the motor voltage the 3rd or 5th core respectively is required fo...

Страница 10: ... e g type WRM 24V WRM2 or 1 rain detector e g RM RM2 Only with TRZ Plus Comfort or with additional module WRMAS in each case one connection for potential free report SHE activated NO normally Open contact and malfunction NC normally closed contact 24V max 0 5 A Only with TRZ Plus Comfort or with additional module WRMAS Fuse F2 Motor Switch SHE Closed Reset DIP Switch PC Service Port Fuse battery B...

Страница 11: ...ction No SHE and no malfunction detection green LED OK operating is shining Activate SHE The closing contact at the terminals 4 5 switches The function is OK if the passage can be measured Activate SHE Closed initial position no SHE activation and no malfunction detection Take off the battery fuse F3 to simulate a malfunction Activation Replace fuse F3 back control panel again in initial position ...

Страница 12: ...g diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel or of the external components The notes and installation directives in the technical documentation are always to be observed Provide a separately disengageable circuit Secure against unintentional switching off several drives per motor circ...

Страница 13: ...lour mix ups can lead to incorrect function of the control panel or of the external components The notes and installation directives in the technical documentation are always to be observed Connecting Diagram Magnetic Clamps Magnetic Locking Magnetic locking one magnetic clamp magnetic locking Magnetic clamp Magnetic locking Magnetic clamp several magnetic clamps magnetic lockings Junction box Jun...

Страница 14: ...s connected Route the connecting cables into the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel or of the external components The notes and installation directives in the technical documentation are alw...

Страница 15: ...6 1 OK 10kΩ RBH 3A OK RBH 3A RBH 3A All work to be carried out without mains supply 230V AC or any batteries connected Route the connecting cables into the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel...

Страница 16: ...el or of the external components The notes and installation directives in the technical documentation are always to be observed without smoke detector one smoke detector SSD 521 UTD 521 UTD 523 MSD 523 last smoke detector several smoke detectors SSD 521 UTD 521 UTD 523 MSD 523 one smoke detector last smoke detector last smoke detector 1 smoke detector 18 19 10kΩ 18 19 1 2 3 4 5 6 1 2 3 4 5 6 10kΩ ...

Страница 17: ...es into the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel or of the external components The notes and installation directives in the technical documentation are always to be observed without fire alarm...

Страница 18: ...o the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel or of the external components The notes and installation directives in the technical documentation are always to be observed with alarm buzzer with a...

Страница 19: ...ied out without mains supply 230V AC or any batteries connected Route the connecting cables into the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrected connections or figure or colour mix ups can lead to incorrect function of the control panel or of the external components The notes and installa...

Страница 20: ...ical documentation are always to be observed Variant 1 with two temperature sensors Adjustable hysteresis for opening and closing of windows over the respective temperature sensor The farther apart the temperature values the less unwanted movement commands from the window operators are short term temperature changes for example Drafts made STOP 4 3 2 1 8 11 10 9 20 C 18 C á á S P Ö S P Ö H A 3 4 4...

Страница 21: ...connections for the power supply of the multisensor Notes to the DIP switches are observed Are an external buzzer or flashing light connected to signal an SHE message to these terminals the energy supply of the terminals to the additional board WRMAS is apparent see Option 2 20 21 11 10 8 MS 6 á á S P Ö S P Ö 24 V DC GND Ensure jumper position open close Variant 2 Energy supply for the multisensor...

Страница 22: ... Connection Diagram All work to be carried out without mains supply 230V AC or any batteries connected Route the connecting cables into the control panel housing at the top Connect all connecting cables according to the wiring diagram and make sure that they are correctly connected Incorrect connections or figure or colour mix ups can lead to incorrect function of the control panel or of the exter...

Страница 23: ... 230 V AC and without accumulator attached Factory settings for the DIP Switch are position OFF Position ON means DIP Switch 1 Motor timing device is switched off in SHE for 30 min VdS function DIP Switch 2 Motor output permanently switched on for operation with magnetic clamps to reinforce the locking force of the drives sealed closure of windows Battery is not buffered Switched off in the factor...

Страница 24: ...ch 8 ON additionally via Close button of an SHE manual calling point DIP Switch 5 Pre alert A malfunction signal will take place if an automatic detector releases if more than one automatic detector releases SHE release will take place DIP Switch 6 Actuation limit Time dependent ventilation actuation limit For adjustment see section on Functional description actuation limit DIP Switch 7 Malfunctio...

Страница 25: ...Operating mode SHE and ventilation without stroke limit DIP Switch 2 3 ON Combination with DIP Switch 4 5 7 12 still possible Function Shut in direction Closed e g push button closing malfunction takes 3 minutes time until unlocking the motor exits Note The ventilation command close has to be preformed for at least 3 minutes before start up procedure DIP Switches activation When the settings of th...

Страница 26: ...onnection not OK Red LED lit up Press SHE Reset switch in the control panel Yellow LED is flashing check corresponding fuses see also beep code chart page 57 cable breakage check cable connections check if end module is missing in last smoke detector Ferritkern Battery lead Vent switches Press vent switch Open briefly the drives open the windows completely up to end position The display ventilatio...

Страница 27: ...ter max 100 sec The yellow LED malfunction flashes In case of power failure the windows close immediately Press the Open switch of the vent switch no window reaction Press the switch SHE Open the windows open The red LED SHE activation is shining The green LED OK operating OK not lit up Press the switch Closed of the SHE manual call point the windows close completely The red LED SHE activation goe...

Страница 28: ... will still remain Completion work Insert the glass panes in all SHE manual call points Close the control panel door Stick on the service contact telephone number Attention If the trial run fails repeat the initial start up procedure Troubleshooting Display operating OK is not shining in the SHE manual call points and the control panel a malfunction has occurred see malfunction beep code chart pag...

Страница 29: ...el to secure the door Malfunction beep code chart The pulse sequence gives information regarding the source of the malfunction The continuous acoustical signal rings out only by SHE man call point with buzzer and if the door contact switch is pressed Note The yellow LED malfunction the red LED SHE activation and the green LED OK operating OK lits up permanently during the memory checks Maintenance...

Страница 30: ...o this purpose we recommend a service contract with the manufacturer or another authorized specialist All standard batteries provided with the SHE control panel require regular checks as part of the maintenance programme and are to be replaced after the specified service life 4 years Observe the legal requirements when disposing of hazardous materials e g batteries Reset of the maintenance timer i...

Страница 31: ...gspan SHE Control Panel TRZ Plus 2A and TRZ Plus Comfort 12 24999513 Dimensional drawing TRZ Plus 2A and TRZ Plus Comfort SMOKE VENT SMOKE VENT STOP 119 mm 195 mm 142 mm 146 mm 80 mm 83 mm TRZ Plus Comfort TRZ Plus 2A 215 mm ...

Страница 32: ...ts and the vent switches must be well visible and accessible SHE call point 1 4 m over the top edge of the floor Do not assemble behind wall projections door casements or hide behind construction elements Open the SHE control panel and fix it at the specified bore holes to the construction body Make sure to provide appropriate material for the fixations Assembly of control elements drives junction...

Страница 33: ...e No overhead installation or rotated by 180 mounting The control system must not be hidden by wall projections doors or structures Assembly Once the housing has been fastened to the wall 1 Insert ventilation plug on the underside of the housing Note Operating the control system without the ventilation plug can lead to malfunction and is not permitted Take care that the ventilation plug is not cov...

Страница 34: ... the housing has been fastened to the wall 1 Thread velcro tapes for attaching the rechargeable batteries into the assembly panel Attention Start up procedure of the control panel only with installed plexiglass cover Note The Control panel is also available with a UP mounting kit Inserting the rechargeable batteries 1 With the help of the velcro tapes C in the bottom part of the baseplate fasten t...

Страница 35: ...ected to mains voltage during configuration From version 01 04 00 onwards the control panel type TRZ Plus or Compact control panel 2A can be configured via the Service Port Software After starting the Service Port Software and clicking the Search button the configuration screen is automatically launched This interface is also used for the configuration of the compact control panel 2A and 2A M The ...

Страница 36: ...usted manually After using the vent switch operation the drive closes according to the adjustment If vent switch operation is interrupted this function is deactivated and is not reactivated until opened again using the vent switch button operation Note This function is deactivated when supplied 2 2 Maximum opening using ventilation function This function is used to set up stroke limitation by run ...

Страница 37: ...e Port Software After entering the password you get into the user interface of the service counter Here the maintenance counter is disabled or enabled Through the user interface maintenance counter any time can be chosen to signal a maintenance due The overdue maintenance is then displayed on the flashing green power LED Functions are not interrupted The maintenance counter is only active when the...

Страница 38: ...c according to EN 12101 10 maximum current output 2A switched off at the primary energy source Charging time 24 h for emergency power Terminal max 1 5 mm 4 8 blade terminal with insulating bush 200 mm long Monitoring yes cyclical total discharge prot Fuse F3 battery FKS 5A Output Voltage Drives Magnetic clamps 27 V DC nominal 25 10 power Pmax 54W Pmin 0W Ripple Drives Magnetic clamps 1 Power nomin...

Страница 39: ...s failure no ventilation blocked Safety functions in the event of mains failure yes automatic closure of the windows ventilation blocked while SHE continues to be active further functions via DIP Switches Maintenance Battery replacement every 4 years and in the event of battery malfunction Maintenance counter yes adjustable via PC Service Port Software Maintenance counter active when power is supp...

Страница 40: ...er max 100 mA 100 ED Terminal max 1 mm screw terminal Cable monitoring function no max Pieces 1 Type WRM RM WRM2 RM2 Emergency power no Fuse no Free transmission SHE activation Closing contact max 30 V DC 0 5 amp collect Malfunction Opening contact max 30 V DC 0 5 amp When dimensioning the power supply and the cable cross sections for the supply lines to the motors as a function of the drive used ...

Страница 41: ...cts or methods of working are for information only and Kingspan Limited and its subsidiaries accept no liability in respect thereof 07 2019 UK Kingspan Light Air Mellyn Mair Business Centre Lamby Industrial Park Wentloog Avenue Cardiff CF3 2EX T 44 0 29 2077 6160 Kingspan Light Air North East of England Business Centre Wearfield Enterprise Park Sunderland SR5 2TA T 44 0 191 5166253 E info kingspan...

Отзывы: