![Keysight Technologies N6900 Series Скачать руководство пользователя страница 321](http://html1.mh-extra.com/html/keysight-technologies/n6900-series/n6900-series_operating-and-service-manual_1962217321.webp)
Front Panel Menu Reference
SCPI Command
Select System\Admin\Cal\Misc\CurrShar.
Check that the short is connected and select Next.
Step 3. Select the first calibration point. Measure the voltage across the sharing connector and enter
the data.
Front Panel Menu Reference
SCPI Command
Display shows: “Enter P1 measured data”. Enter the data from
the external DVM. This should be about -1 volt. Press Enter
when done. Press Back to finish.
CAL:LEV P1
*OPC?
CAL:DATA <data>
Step 4. After the calibration completes, disconnect the voltmeter and short.
Resistance Bottom-Out Calibration
This procedure calibrates the minimum voltage that can be achieved while sinking current.
Step 1. Connect an external power supply to the + and - output terminals (see
).
Step 2. Set the external supply as follows: Voltage setting = (0.9 V + 0.08 * rated output voltage of the
power supply) volts. The voltage must be within 10% of this value. Current limit = (0.95 * rated output
current of the power supply) amps. The current limit must be within 2% of this value.
Step 3. Select the resistance bottom-out calibration. Calibration takes approximately 5 seconds.
Front Panel Menu Reference
SCPI Command
Select System\Admin\Cal\Misc\ResBout. Check that the
power supply is connected and select Next.
Step 4. After the calibration completes, disconnect the power supply.
Enter a Calibration Date
Front Panel Menu Reference
SCPI Command
Select System\Admin\Cal\Date.
Enter the calibration date in the Date field. If desired, you can
enter alphanumeric data in this field.
Save Calibration and Log Out
Front Panel Menu Reference
SCPI Command
Select System\Admin\Cal\Save. Select Save.
Select System\Admin\Logout
To save calibration data:
To exit calibration mode:
Keysight N6900/N7900 Series Operating and Service Guide
321
7 Verification and Calibration
Содержание N6900 Series
Страница 1: ...Keysight Advanced Power System N6900 N7900 Series Operating and Service Guide...
Страница 2: ......
Страница 63: ...1 kW Models Keysight N6900 N7900 Series Operating and Service Guide 63 1 Quick Reference...
Страница 64: ...2 kW Models 1 Quick Reference 64 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 78: ...2 Installing the Instrument 78 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 90: ...Rack Mounting 2 Installing the Instrument 90 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 289: ...Status Diagram 6 SCPI Programming Reference 289 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 354: ...Cover screws 8 Service and Maintenance 354 Keysight N6900 N7900 Series Operating and Service Guide...