2 Keysight N5292A User’s and Service Guide
Contents
Torquing Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Long Term Storage of Test Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
Protect Against Electrostatic Discharge (ESD) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
Review the Principles of Connector Care . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
Initial Setup for the N5292A Test Set Functional Verification . . . . . . . . . . . . . . . . . . . . 3-16
Performing the N5292A Test Set Functional Verification . . . . . . . . . . . . . . . . . . . . . . . 3-23
If the N5290/1A Operator’s Check Fails . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-44
Test Management Environment (TME) Performance Tests (N5290/1 A Millimeter System Only)
Troubleshooting Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
Troubleshooting Organization Flowchart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
N5290/1A Millimeter-Wave System Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
N5292A Test Controller Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
Power Supplies and Fans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
No DC Power for Millimeter-wave Modules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
Procedure for identifying a faulty millimeter head: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
Verifying the A5 Test Set Motherboard (TSMB) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9
Verifying the A1 power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17
Verifying the A2 LOPA, A3 LODA, and A4 Phase Compensation Boards . . . . . . . . . . . . 4-22
Head Stability Check. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-25
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...