3-26 Keysight N5290/1A Service Guide
System Tests and Adjustments
N5292A Functional Verification Procedure
3-
Figure 3-16
Typical LO maximum power (with path corrections)
Millimeter (mm) Head Heater DAC and Power Supplies Check (Heater
Dac/Voltage)
This Test also checks that the Heater DAC and related bias circuits works
properly.
Required equipment:
— 26.5 GHz PNA-B with Option 020
IMPORTANT!
Ensure that:
—
N5292A test set is powered down, before connecting the power supply
fixture ET57265, to avoid damaging the N5292A test set or the power
supply fixture ET57265.
—
N5292A test set is powered down and the ET is removed immediately
after
the testing is complete.
This section assumes you have already downloaded the Launch Test
application to your PC. If not, refer to
“PNA Calibration (Pna Cal) and
Loading the N5292A Test Set Functional Verification Software (Launch
For more on troubleshooting the millimeter heads refer to
identifying a faulty millimeter head:” on page 4-8
.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...