Keysight N5290/1A Service Guide 3-13
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
g.
If your instruments are not warmed up for two hours, repeat step
Else, skip to next step.
5.
Both traces should track each other and look relatively flat. Refer to
.
Figure 3-7
Typical Cable Return Loss Response (port 2 trace is displayed below)
6.
While observing the traces, gently lift the cable (at or near where the
cable bends) up and down a few times. Traces should remain stable and
free from any major spikes or holes (
≤
0.1 dB p–p). Refer to
.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...