Keysight N5290/1A Service Guide 3-33
System Tests and Adjustments
N5292A Functional Verification Procedure
When a defective cable or connector has been replaced and the test set
has been repaired, the following tests are required:
—
Test set and N5290A/91 A system calibration
— Insertion Loss/Match-S-parameters (verify PNA Cal has been
—
LO Verify (Run after Insertion Loss/Match are verified.)
IMPORTANT!
LO power verification is only required on the port that the
connector or and cabling was replaced.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...