3-42 Keysight N5290/1A Service Guide
System Tests and Adjustments
N5290/1A Millimeter-wave Test System Operator’s Check
3-
Performing the Operator’s Check
1.
Press
UTILITY > System > Service > Verification > Operator's Check
.
2.
In the PNA Operator's Check dialog box (refer to
), under Configure, select either:
— Prompt for attachment of Short/Open
, to pause at each step in the
process to allow moving the short/open to the appropriate port
— Shorts/Opens are attached to ALL ports
, to run through the test
without stopping. Shorts and opens can be mixed on the test ports
—
Additionally, you can choose:
—
Pause on Failure
—
Use unique log, to create a log file for this Operator's
Check
3.
Click
Begin
.
4.
If shorts and opens are not connected to all ports, you will be prompted to
connect them as needed.
5.
The result of the operator's check will be shown as a PASS or FAIL next to
each test (refer to
). The PNA Operator's Check
dialog box will look different for different PNA model numbers and
installed options. Some of the tests are performed only if the appropriate
options are installed in the PNA.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...