Keysight N5290/1A Service Guide 3-11
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
4.
When finished, the following dialog box is displayed. Remove the load and
press Finish. Refer to
Figure 3-5
Millimeter Installation Cal – Dialog Box Load Calibration "Finish"
5.
The following dialog box is displayed until the calibration is finished (i.e., It
is not necessary to connect a calibration kit open for this step. Refer to
.
Figure 3-6
Millimeter Installation Cal – Dialog Box Open–circuit Calibration Ongoing/
"Finish"
6.
If prompted, repeat steps
through
for all of the other ports requiring
calibration.
The Head Cable Checks
A faulty test port cable can cause a failure in the verification test. The following
checks are not required, but are recommended to verify the performance of the
test port cable. These checks verify the integrity of the head cables that
connect to the N5292A test set.
—
“Head Cable Stability Check” on page 3-12
Accessories Used in the Head Check
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...