4-16 Keysight N5290/1A Service Guide
N5290/91A Troubleshooting
N5292A Test Controller Troubleshooting
4-
Figure 4-7
Group 3 Test Point Details
Verifying A5 Test Set Motherboard Connectors, Cables, and Voltages
1.
Power down the test set and remove the top and bottom covers. Refer to
“Removing the Outer Cover” on page 7-8
2.
If not previously done, verify the continuity of the F1–F8 fuses. If
necessary, use the "Spare" fuse (F9). Refer to
If the fuse was faulty was replaced, proceed to step
.
3.
If the fuses are OK, inspect that the J3–J6 DC cables and J7–J11 head
digital control cables are installed properly. If not, power down the test
set, and re-seat the connectors. Then power up the test set, and recheck
the operation of the head(s) and test set. Refer to
4.
If the fuses are OK, verify the voltages at the corresponding port’s TSMB
connector pins (J3–J6). (I.e., Port 1 (A), port 2 (B), port 3 (C), and port 4
(D).) Refer to
.
If no problem found or only one connector pin is failing the voltage check,
continue to step
“Verifying the A1 power supply” on page 4-17
and then
to
step
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...