3-16 Keysight N5290/1A Service Guide
System Tests and Adjustments
N5292A Functional Verification Procedure
3-
N5292A Functional Verification Procedure
This procedure contains two main sections:
—
“Initial Setup for the N5292A Test Set Functional Verification” on
—
“Performing the N5292A Test Set Functional Verification” on page 3-23
Initial Setup for the N5292A Test Set Functional Verification
The following procedure provides instructions for setting up equipment to
verify the N5292A test set. The N5292A test set must pass the operator’s
check, before the N5290/1A millimeter test system can be checked in the next
section. For the N5290/1A system verify, refer to
Test System Operator’s Check” on page 3-41
The following procedures use the N5292A Test Set Utility (
) as
part of the functional verification process. Refer to
http://na.support.keysight.com/pna/files/N5292A_TESTS.exe
and to
Calibration (Pna Cal) and Loading the N5292A Test Set Functional
Verification Software (Launch Test)” on page 3-22
The instructions in this section and in generally assume a 4-Port N5292A. If
you are using a 2-Port N5292A, omit Ports 3 and 4.
— Millimeter head heater DAC values and power supply
— Millimeter head recognition
STOP!
This section assumes you have completed the N5290/1A Incoming
Electrical Inspection and have isolated the problem to the N5292A test set.
If you are not sure the system problem is in the N5292A and you have not
completed the N5290/1A Incoming Electrical Inspection, refer to
N5290/1A Millimeter Test System Preliminary Check” on page 3-7
STOP!
Before you begin this section, on your PNA, download and install
the
N5292A Test Set Functional Verification software
(
). Refer
http://na.support.keysight.com/pna/files/N5292A_TESTS.exe
Calibration (Pna Cal) and Loading the N5292A Test Set Functional
Verification Software (Launch Test)” on page 3-22
.
IMPORTANT!
Before you begin any testing on a System or instrument,
always inspect the connectors on the instrument, the calibration kit,
cables and adapters.
IMPORTANT!
For purchasing test set functional verification test fixtures,
please contact Keysight. Refer to
“Contacting Keysight” on page 2-7
.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...