Keysight N5290/1A Service Guide 4-17
N5290/91A Troubleshooting
N5292A Test Controller Troubleshooting
5.
If the J3-J6 voltages are OK, and only one port is failing, and the head(s)
are working OK on other ports, then swap out a known good J3–J6 cable
and retest that port. Refer to
and to step
.
“Verifying the A1 power supply” on page 4-17
6.
Replace the defective cable or TSMB. Refer to
7.
f the power supply fixture voltages are OK, proceed to
Verification Procedure” on page 3-16
. If the N5292A test set passes the
Operation Check, then reinstall the top and bottom covers. Refer to
“Removing the Cover” on page 7-8
.
Verifying the A1 power supply
1.
Connect the power supply fixture to the suspect port and tighten finger
tight.
2.
Power up the test set.
3.
Probe each of the J3–J6 power supply fixture test points, verifying that
each voltage is /-0.2V of the values shown in
. See also,
.
If the voltages are
≥
+/-0.2V of the values shown, then step
If the power supply fixture volts have already been verified, skip to step
.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...