3-14 Keysight N5290/1A Service Guide
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
3-
Figure 3-8
Lifting the cable at the bend and watching for trace spikes/instability
7.
Gently extend the head (exercising care to not overextend) and rotate side
to side (less than 90 degree) making sure traces are relatively stable and
still tracking each other. Refer to
.
Figure 3-9
Gently extending the head and exercise carefully so as not to overextend
8.
Repeat steps
through
as required for suspected faulty ports.
Содержание N5222B
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Страница 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Страница 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Страница 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Страница 185: ...Keysight N5290 1A Service Guide 7 9 Repair and Replacement Procedures Removing the Cover Figure 7 3 Outer Cover Removal ...
Страница 214: ...7 38 Keysight N5290 1A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 224: ...8 10 Keysight N5290 1A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...
Страница 225: ...Installation Note Xxxxx xxxxx 3 ...