Keysight N5221A/22A Service Guide 4-13
Troubleshooting
Power Up Troubleshooting
Check for shorts (zero
Ω
) or very low resistance (approximately 1
Ω
). If a short
or low resistance is measured, isolate each of the remaining four boards in the
following order, and recheck the shorted test point after each board is
removed. You should be able to determine if the shorted condition has
changed.
Isolate the remaining three assemblies:
— remove the A17 CPU board
— remove the A16 power supply
— remove the A15 midplane board
— This leaves only the A14 system motherboard installed. If the resistance
measurements are still incorrect, this is the suspected faulty assembly.
If the Fans Are Not Operating
If all three fans are not operating, suspect a power supply problem or a
defective A14 system motherboard. Refer to
to check the individual supplies. If the supplies are within
specifications, the most probable cause is a defective A14 system
“Removing and Replacing the A14 System
.
If only one or two fans are not functioning, and the power supplies are within
specifications, suspect the A14 system motherboard or defective fan(s).
Perform the following procedure.
1.
Remove the fan bracket, with fans attached, from the analyzer to expose
the fan power cable connections on the A14 system motherboard. Refer to
for location of these connections. Refer to
Replacing the Fans” on page 7-56
.
2.
Plug in the power cord and measure the fan voltages at all three
connectors on the A14 system motherboard. THIS MUST BE DONE
QUICKLY AS THE ANALYZER WILL RAPIDLY OVERHEAT WITHOUT THE
COOLING EFFECT OF THE FANS. DO NOT PLUG IN THE POWER CORD
UNTIL READY TO PERFORM MEASUREMENTS.
The power supply may be in thermal shutdown if the instrument has been
operating without the fans running. Allow the instrument to cool down
before troubleshooting.
Содержание N5221A
Страница 9: ...Contents Keysight N5221A 22A Service Guide 10 ...
Страница 10: ...11 Keysight N5221A 22A Service Guide Contents ...
Страница 132: ...5 8 Keysight N5221A 22A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 148: ...5 24 Keysight N5221A 22A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 6 4 Port Receiver Group ...
Страница 149: ...Keysight N5221A 22A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 7 2 Port Receiver Group ...
Страница 156: ...5 32 Keysight N5221A 22A Service Guide Theory of Operation Power Supply Group Operation 5 ...
Страница 264: ...6 108 Keysight N5221A 22A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 328: ...7 64 Keysight N5221A 22A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 346: ...8 18 Keysight N5221A 22A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...