8-10 Keysight N5221A/22A Service Guide
General Purpose Maintenance Procedures
Error Terms
8-
The measurements most affected by load match errors are all transmission
measurements, and reflection measurements of a low insertion loss two-port
device, such as an airline.
Typical Cause of Failure
The
calibration kit load or a bad “thru” cable
is the most common cause of
load match specification failure.
If the load and cable performance are independently verified, then suspect the
analyzer
test port coupler, step attenuator, or the test receiver
at the bad
port.
To troubleshoot, refer to
“Checking the Receiver Group” on page 4-43
or to
“Checking the Signal Separation Group” on page 4-39
Isolation (Crosstalk) (E
XF
and E
XR
)
Isolation, or crosstalk, is the uncorrected forward and reverse isolation error
terms that represent leakage between the test ports and the signal paths. The
isolation error terms are characterized by measuring transmission (S
21
, S
12
)
with loads attached to both ports during the measurement calibration.isolation
errors affect transmission measurements primarily where the measured signal
level is very low.
The measurements most affected by isolation error terms are DUTs with large
insertion loss. Since these terms are low in magnitude, they are usually noisy
(not very repeatable).
Typical Cause of Failure
A
loose cable connection or leakage between components
in the test set are
the most likely cause of isolation problems.
After verifying the cable and its connections, suspect the analyzer
switch
splitter, step attenuator, coupler, or receivers, and associated cabling
.
“Checking the Receiver Group” on page 4-43
or to
Содержание N5221A
Страница 9: ...Contents Keysight N5221A 22A Service Guide 10 ...
Страница 10: ...11 Keysight N5221A 22A Service Guide Contents ...
Страница 132: ...5 8 Keysight N5221A 22A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 148: ...5 24 Keysight N5221A 22A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 6 4 Port Receiver Group ...
Страница 149: ...Keysight N5221A 22A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 7 2 Port Receiver Group ...
Страница 156: ...5 32 Keysight N5221A 22A Service Guide Theory of Operation Power Supply Group Operation 5 ...
Страница 264: ...6 108 Keysight N5221A 22A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 328: ...7 64 Keysight N5221A 22A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 346: ...8 18 Keysight N5221A 22A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...