A80, A80t, W80, W80t Operating Manual
28.08.2019
31
After removing the
ventilation grid, the drain
nozzle (7) and the drain
screw (8) can be operated.
For draining:
•
Attach a tube (outer
diameter 12 mm) to the
drain port (7).
•
Place a suitable
container for holding or
storing the liquid under
the unit.
A80
W80
The draining operation is menu-driven on the user interface, but it also
requires some mechanical operations.
Call up the main menu,
then press
www.
GlobalTestSupply
.com
Find Quality Products Online at: