© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 8
Section 6
UBA™ Pro Series Universal Banknote Acceptor
Calibration and Testing
Performance Test Using a PC
List of UBA Pro Performance Tests
Table 6-1 lists the test items for the UBA Pro Unit
Performance Test using a PC.
Launch Performance Test Program
To launch the Performance Test program, proceed
as follows:
1. Remove electrical power from the UBA Pro Unit.
2. Set DIP Switches as below (Figure 6-38).
3. Connect the UBA Pro Unit to the PC. (Refer to
Figure 6-1 for the Tool Requirements and Har-
ness Connector locations.)
4. Apply electrical power to the UBA Pro Unit.
5. The
Green
and
Red
Status LEDs will be lit.
6. Launch the “
JCM Tool Suite Standard Edition
”
Application.
7. Click and hold-down the “
Service Mode
” Pull-
Down Menu.
8. Select “
Performance Test
a
).
9. The Performance Test Main Screen will appear
Banknote Acceptance Test with Cash
Box
To perform the Acceptance Test validating Banknotes
with the Cash Box installed, proceed as follows:
1. Ensure that the Cash Box is properly installed.
2. Launch the Performance Test Program (see
page 6-8).
3. Select “
ACCEPT_SS_TEST
” (Figure 6-41
a
).
4. Click the “
Start
”
Screen Button (Figure 6-
b
).
5. Insert a Banknote.
6. Confirm that the UBA Pro accepts the Banknote.
7. Click the “
Stop
”
Screen Button (Figure 6-
c
) to end the test.
Table 6-1
List of the UBA Pro Performance Tests
Test Item
Page
Banknote Acceptance Test with Cash Box
*
*. This test is available when the Cash Box is correctly seated.
Banknote Acceptance Test without Cash Box
†. This test is available when the Cash Box is NOT seated.
Non-Validation Banknote Acceptance Test with
Cash Box
Non-Validation Banknote Acceptance Test without
Cash Box
Non-Validation Banknote Reject Test with Cash
Box
Feed Motor Speed Test (Forward)
Feed Motor Speed Test (Reverse)
Stacker Motor Operation Time Test
Centering Motor Operation Time Test
Entrance Motor Speed Test (Forward)
Entrance Motor Speed Test (Reverse)
Entrance and Feed Motors Simultaneous Speed
Entrance and Feed Motors Simultaneous Speed
Launch Performance Test Program
Figure 6-38
Launch Performance Test Program 1
DIP Switch #8 ON
ON
1
2
3
4
5
6
7
8
Launch Performance Test Program
Figure 6-39
Launch Performance Test Program 2
a
Launch Performance Test Program
Figure 6-40
Launch Performance Test Program 3
Figure 6-41
Banknote Acceptance Test
with Cash Box
a
b
c
Содержание UBA Pro Series
Страница 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 131: ...UBA Pro Series Universal Banknote Acceptor P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 132: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Issue 4116 SME 01 00...