© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 1
Calibration and Testing
UBA™ Pro Series Universal Banknote Acceptor
Section 6
7. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Aging Test with Cash Box
To perform the Aging Test with the Cash Box, pro-
ceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-100).
3. Ensure that the Cash Box is properly installed.
4. Apply electrical power.
5. Confirm that the
Green
and
Red
Status LEDs are
lit.
6. To start the Test, set the DIP Switch #8 to
OFF
7. The aging operation will begin.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
DIP Switch Test
To perform the DIP Switch Test, proceed as fol-
lows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-103).
Sensor/
Mechanism
Procedure and Confirmation
PB_IN
&
PB_OUT
(1) DIP Switch #2 ON
(2) Open the Cover.
(3) Cover the Sensor with a Banknote
(4) Close the Cover firmly.
(5) Confirm that the Status LED is lit as
below when the Sensor detects the
Banknote:
PB IN Sensor:
Green
LED
PB OUT Sensor:
Red
LED
PB Home
&
Centering Home
(1) DIP Switch #3 ON
(2) Open the Cover.
(3) Move the PB Guide with your finger.
(4) Confirm that the
Green
LED is lit.
(5) Move the Centering Mechanism with your
fingers.
(6) Confirm that the
Orange
and
Red
LEDs
are lit.
Pusher Home
&
Box Exist
(1) DIP Switch #5 ON
(2) Remove the Cash Box.
(3) Reach to and push each “Arm” linked to
the Sensors on the bottom of the Unit.
(4) Confirm that the Status LED is lit as
below when the Sensor turns on:
Pusher Home Sensor:
Green
LED
Box Exist Sensor:
Red
LED
Exit
(1) DIP Switch #6 ON
(2) Remove the Cash Box.
(3) Insert a Banknote from the bottom of the
Unit.
(4) Confirm that the
Green
LED is lit.
ON
1
2
3
4
5
6
7
8
ON
1
2
3
4
5
6
7
8
PB Guide
Centering
Mechanism
ON
1
2
3
4
5
6
7
8
ON
1
2
3
4
5
6
7
8
Figure 6-100
Aging Test with Cash Box 1
DIP Switches #4, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-101
Figure 6-101
Aging Test with Cash Box 2
Green Red
Figure 6-102
Figure 6-102
Aging Test with Cash Box 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-103
Figure 6-103
DIP Switch Test 1
DIP Switches All ON
ON
1
2
3
4
5
6
7
8
Содержание UBA Pro Series
Страница 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...