Stacker Motor Operation Test
To perform the Stacker Motor Operation Test without
the Cash Box, proceed as follows:
1. Remove electrical power.
2. Remove the Cash Box.
3. Set the DIP Switches as below (Figure 6-121).
4. Apply electrical power.
5. Confirm that the
Green
and
Red
Status LEDs are
lit.
6. To start the Test, set the DIP Switch #8 to
OFF
7. The Stack Gear will start spinning when the
Stacker Motor functions properly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Entrance Motor Operation Test (For-
ward)
To perform the Entrance Motor Operation Test in the
forward rotation, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-125).
3. Apply electrical power.
4. Confirm that the
Green
and
Red
Status LEDs are
lit.
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro’s Cover
6. To start the Test, set the DIP Switch #8 to
OFF
7. The Rollers will start running in the forward
direction when the Feed Motor functions prop-
erly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
NOTE: Be sure to remove the Cash Box
to avoid the risk of damage.
Stacker Motor Operation Test 1
Figure 6-121
Stacker Motor Operation Test 1
DIP Switches #1, #3, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-122
Stacker Motor Operation Test 2
Green Red
Figure 6-123
Figure 6-123
Stacker Motor Operation Test 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Stacker Motor Operation Test 4
Figure 6-124
Stacker Motor Operation Test 4
Stack Gear
Figure 6-125
Figure 6-125
Entrance Motor Operation Test
(Forward) 1
DIP Switches #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-126
Figure 6-126
Entrance Motor Operation Test
(Forward) 2
Green Red
Figure 6-127
Figure 6-127
Entrance Motor Operation Test
(Forward) 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-128
Entrance Motor Operation Test
(Forward) 4
Содержание UBA Pro Series
Страница 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 131: ...UBA Pro Series Universal Banknote Acceptor P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD...
Страница 132: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD UBA Pro Series Universal Banknote Acceptor Issue 4116 SME 01 00...