Maintenance
XHD Installation, Operation, and Maintenance Manual
112
4. Place the bearing frame adjustment plates (234F) onto the pedestal (131) and bearing
cartridge housing (228) rails.
5. Hand tighten the bearing frame adjustment plates (234F) to the pedestal (131) using the
adjustment plate hex bolts (352G) and nuts (427D).
Figure 104: Frame adjustment plate bolting pre-assembly
6. Insert the free ends of the threaded adjustment rods (370X) through the bearing frame
adjustment plate (234F) and outboard end cover (109) ears.
Figure 105: Adjustment rod assembly
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...