Commissioning, Startup, Operation, and Shutdown
XHD Installation, Operation, and Maintenance Manual
59
c) Three packing rings (106)
1. Flush connection
2. Packing rings
3. Lantern ring
Figure 41: Weep flush setting (2L3)
For full flush setting (L5):
a) One lantern ring (105)
b) Five packing rings (106)
1. Flush connection
2. Packing rings
3. Lantern ring
Figure 42: Full flush setting (L5)
For full flush setting (1L4):
a) One packing ring (106)
b) One lantern ring (105)
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...