Maintenance
XHD Installation, Operation, and Maintenance Manual
99
3. Carefully remove the assembly and hoist to the ground to disassemble as required, using
the instructions in the related sections of this instruction manual.
Figure 84: Removal of gland half casing
Figure 85: Gland half casing disassembly
Locate and lift the volute liner for optional discharge locations (field
replacement) - Rubber-Lined
1. The Volute Liner (600T) can be installed into the Gland Casing (100D) the field in any of the
optional discharge orientations.
2. Remove the Suction casing and Suction Liner assembly as described in the section
'Remove the Suction Side.
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...