Maintenance
XHD Installation, Operation, and Maintenance Manual
111
Figure 102: Outboard bearing cover assembly
21. Insert the shaft key (400) into the keyway in the outboard end of the shaft (122).
22. Install the bulls eye sight glass (319) and plug, opposite (408N) into the bearing cartridge
housing (228) if removed previously.
23. Insert the oil drain plugs (408A) and the oil fill pipe plug (319B) into the bearing cartridge
housing (228).
Assemble the power end to the pedestal
1. Apply anti-seizing compound to the pedestal (131) rails that support the power end.
2. Attach the hoist hook to the bearing cartridge housing (228) lifting lug.
3. Place the power end into position on the pedestal (131).
Figure 103: Power end to pedestal assembly
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...