background image

 

1

AUTOMATIC Cu/Ag IONISATION WATER TREATMENT SYSTEM 

 
 

 
 

Installation

 

Instructions

 

&

 

User Guide

 

 
 
 
 
 
 
 
 

Please read carefully and keep available for later use

 

 

 
 

Version 11/2013 

SR-12-164-1 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 

     

STÉRILOR Cu/Ag

Содержание STERILOR Cu/Ag

Страница 1: ...1 AUTOMATIC Cu Ag IONISATION WATER TREATMENT SYSTEM Installation Instructions User Guide Please read carefully and keep available for later use Version 11 2013 SR 12 164 1 STÉRILOR Cu Ag ...

Страница 2: ...2 ...

Страница 3: ...afe place It will long be your guide for optimised installation and operation of all of the equipment for your new device Read it carefully before use in order to fully benefit from all of its functions By using STERILOR Cu Ag with a pH that is well regulated around 7 2 your pool s water will be perfectly disinfected You can adjust the pH manually or automatically by installing a STERILOR pH USEFU...

Страница 4: ...side of the box 8 2 1 4 Lateral sides of the box 8 3 INSTALLATION 9 3 1 Control box 9 3 1 1 Location attachments 9 3 1 2 Fitting 9 3 1 3 Electric connections 10 3 2 Ionisation cell 11 3 3 Cu Ag electrodes 11 4 USE 12 4 1 Memo 12 4 1 1 pH 12 4 1 2 Copper 12 4 1 3 Chlorine 12 4 2 Device operating display 13 4 2 1 Displaying and Setting the time 13 ...

Страница 5: ...ay Operating Forced operation 14 4 4 2 Forced Operation activation and deactivation procedure 14 4 5 Change in polarity 14 4 5 1 Displaying the change in polarity 14 4 5 2 Operating the change in polarity 15 4 6 2 Displaying the diagnoses 15 5 WINTERING 15 6 EARTHING SLEEVE 16 7 MAINTENANCE INSTRUCTIONS 17 7 1 General Maintenance 17 7 2 Copper Silver electrode maintenance 17 8 STORAGE TRANSPORT 17...

Страница 6: ...ies with the characteristics repeated in Paragraph 9 The STERILOR Cu Ag device must operate at the same time as the filtration system because it is essential for the water to flow through the Cu Ag ionisation cell Definition of the synoptics used in these instructions Important information Sensitive point recommendation to be followed to avoid any equipment deterioration or operating problem Elect...

Страница 7: ... to form molecules with algaecide flocculant and disinfectant properties The advantages of STERILOR Cu Ag Automatic water treatment Sterilised and sterilising water A change of polarity in the production current which helps to regulate electrode wear Backlit digital display of the production current device operating times and countdown of the change of polarity time 2 1 2 Supply This device is sup...

Страница 8: ...t display from 600 to 999 mA Ionisation current display from 300 to 595 mA Ionisation current display from 25 to 295mA Device operating time display Time display Polarity and polarity countdown display Forced operation indicator Automatic operation indicator Diagnoses display 2 1 4 Lateral sides of the box Left side Right side Cu Ag electrode connection General power supply fuse holder 1 A ON OFF ...

Страница 9: ...t bad weather and close to the ionisation cell 2 5 m cable The controls of the box switch electrode connection and fuse holder must remain accessible Necessary equipment Drill and 6 mm bit suitable for the support plugs Fix the box securely against a wall via the 4 fixing holes using the screws and plugs supplied plastic expansion plugs to be adapted to the support if necessary Phillips screwdrive...

Страница 10: ...n the box this connection to the filtration pump requires the STERILOR Cu Ag power supply to be cut off at the filtration box The connection is therefore made on the filtration pump contactors in the existing filtration box according to the following diagram Single phase filtration box Three phase filtration box Clock EARTH Auto Op Forced Op PHASE Contactor Circuit PUMP NEUTRAL 380 V THREE PHASE C...

Страница 11: ...e connectors must not be in contact with water Non compliance with this guideline may result in premature corrosion of the connectors and premature deterioration of the cell The STERILOR Cu Ag electrodes are manufactured in accordance with specific specifications with proportions of copper and silver guaranteeing the expected result 3 3 Cu Ag electrodes Connect the cable to the box see chapter 2 1...

Страница 12: ... the water must be maintained between 7 0 and 7 4 The pH of the water in a swimming pool varies naturally and continuously but always keeps the same trend over time 4 1 2 Copper The level of copper must be between 0 5 and 0 7 ppm mg l You are advised to analyse the copper level once a month 4 1 3 Chlorine Whenever the device is used with water that does not contain chlorine carry out manual chlori...

Страница 13: ...rating time i e the operating time of the filtration or the selected time slot if different The consumption of copper and silver depends on the water quality contamination of the pool its level of use the environment and the climatic conditions To keep the copper level stable the current to be produced is proportional to the volume of the pool and the filtration operating time The setting should b...

Страница 14: ...on to disinfect the water especially if it is new water Run the filtration unit in manual operation 24 hours a day 4 4 2 Forced Operation activation and deactivation procedure The forced operation is activated by pressing on the Forced Operation key F key for 5 seconds The red Forced Operation light comes on and the Forced Operation text appears The production then changes to 999mA Leave the equip...

Страница 15: ... the connection and the condition of the electrode There is no water in the ionisation vessel Restart the water flow The electrodes are scaled up or oxidised Clean the electrodes It tells you that the electrode needs to be checked or replaced To cancel this analysis press on the A and F keys at the same time Cancelling the diagnosis signal Before cancelling this signal always check what caused it ...

Страница 16: ...ost negatively charged Bonds are then produced between the molecules causing grey to black disparate stains or even making the whole lining turn a greyish colour The installation of an earthing sleeve prevents these phenomena by earthing the residual electrical currents These stains cannot be eliminated by rubbing and only an acidic medium will make them disappear Assembling earths Earths exist in...

Страница 17: ...release the pressure in the vessel The electrodes must be cleaned once a month The electrodes must be dismantled and brushed metal brush or sandpaper them to remove any deposits The electrodes must be restored to their original colour If the electrodes are not maintained they may wear prematurely 8 STORAGE TRANSPORT Your device must be stored and transported in its original packaging in order to p...

Страница 18: ...rating error by the user or an electric shock The user must contact their retailer according to the after sales service procedure Cut off the guarantee card opposite without forgetting to make a copy before sending it duly completed to the following address The guarantee card below must be returned to us no later than 15 days after commissioning of the device Product STERILOR Cu Ag Company AS POOL...

Страница 19: ...ion that must be provided for the guarantee in order to be taken into account Pool volume m3 Water source Public supply Borehole Well Rain pH Regulated pH device Filtration flow rate m3 h Stabiliser ppm Treatment used TA Total Alkalinity French degrees Type of heating TH hardness measurement French degrees pH corrector product used Trade name Chemical nature Pool Indoor Outdoor Cover Shelter Autom...

Отзывы: