Commissioning, Startup, Operation, and Shutdown
XHD Installation, Operation, and Maintenance Manual
54
b) Place the coupling guard half over the pump-side end plate.
Item Description
1.
Annular groove
2.
Pump-side end plate
3.
Driver
4.
Pump half of the coupling guard
Figure 35: Guard half installation
The annular groove in the coupling guard half must fit around the end plate.
Item Description
1.
Annular groove
2.
End plate (pump end)
2.
Guard half
Figure 36: Annular groove in coupling guard
4. Use a bolt, a nut, and two washers to secure the coupling guard half to the end plate.
Tighten securely.
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...