Maintenance
XHD Installation, Operation, and Maintenance Manual
87
Figure 65: Removal of seal cover
Figure 66: Removal of gland half casing
Locate and lift the volute liner for optional discharge locations (field replacement) - Metal-
Lined
1. Using the ITT approved volute liner and Impeller lifting device, the Volute Liner (561) can
be installed into the Gland Casing (100D) the field in any of the optional discharge
orientations.
2. Remove the Suction casing and Suction Liner assembly as described in the section
'Remove the Suction Side.
Figure 67: Suction casing removal
3. Remove the Impeller as shown in the impeller removal section.
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...