Maintenance
XHD Installation, Operation, and Maintenance Manual
93
Figure 76: Bearing frame adjustment plate removal
3. Slide the bearing housing and shaft assembly forward towards the suction side of the pump
to allow better access to the impeller (101).
4. Remove the two-piece knock-off ring (149).
5. Support the impeller (101) using a strap attached to the hoist. An overhead hoist chain or
sling should be routed through a vane passage to support the impeller.
6. With one person holding the impeller (101) in place, the other person rotates the shaft (122)
counterclockwise to unscrew the impeller. This step should take 4 to 5 complete shaft
turns.
7. Guide the impeller (101) completely free of the shaft threads and casing volute liner (600T).
Figure 77: Impeller removal - Rubber Impeller and Strap Shown
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...