Commissioning, Startup, Operation, and Shutdown
XHD Installation, Operation, and Maintenance Manual
55
Item Description
1.
Nut
2.
Washer
3.
Bolt
Figure 37: Secure coupling guard half to end plate
5. Put the driver half of the coupling guard in place:
a) Slightly spread the bottom apart.
b) Place the driver half of the coupling guard over the pump half of the coupling guard.
The annular groove in the coupling guard half must face the motor.
6. Place the driver-side end plate over the motor shaft.
7. Place the driver-side end plate in the annular groove of the driver-half of the coupling
guard.
8. Use a bolt, a nut, and two washers to secure the coupling guard half to the end plate. Hand-
tighten only.
The hole is located on the driver-side of the coupling guard half.
9. Slide the driver-half of the coupling guard towards the motor so that the coupling guard
completely covers the shafts and coupling.
10. Use a nut, a bolt, and two washers to secure the coupling guard halves together.
11. Tighten all nuts on the guard assembly.
Bearing lubrication
WARNING:
Risk of explosive hazard and premature failure from sparks and heat generation. Ensure
bearings are properly lubricated prior to startup.
NOTICE:
Grease can settle in equipment left idle leaving bearings improperly lubricated. Check the
greasing on a pump that has been out of service for a long period of time and re-grease if
necessary.
Pumps are shipped without oil. You must lubricate oil-lubricated bearings at the job site.
Grease-lubricated bearings are lubricated at the factory.
Lubricate the bearings with oil
WARNING:
Risk of explosive hazard and premature failure from sparks and heat generation. Ensure
bearings are properly lubricated prior to startup.
1. Remove the oil fill pipe plug (319B).
2. Fill the bearing frame with oil through the filler connection that is located on the top of the
bearing frame.
3. Fill the bearing frame with oil until the oil level reaches the middle of the sight glass or
opposite sight glass (319 or 408N). The correct volume of oil required for each size of
Содержание Goulds Pumps XHD
Страница 1: ...Installation Operation and Maintenance Manual XHD ...
Страница 2: ......
Страница 27: ...Installation XHD Installation Operation and Maintenance Manual 25 Direct coupled baseplate leveling worksheet ...
Страница 147: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 145 Figure 130 Optional features ...
Страница 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Страница 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Страница 154: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 152 ATEX notification ...
Страница 155: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 153 IECEx Certificate of Conformity ...
Страница 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...
Страница 157: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 155 Chinese Certificate of Conformity ...