28
6. Control/Operation
6. Control/Operation
6-1.
Creating the ladder logic
6-1-1.
Switching the transfer direction
6-1-2.
Changing the speed
6-2.
Basic operation
6-2-1.
Switching the transfer surface
6-2-2.
About the initial position setting (teaching) of the transfer surface
6-3.
Program example
6-4.
What to do before operation
…… 30
…… 34
…… 34
…… 35
…… 40
…… 41
…… 42
…… 43
F-RAT-NX75 Annex User Manual for IB-P02F-P-FT
Advanced preparation
Product check
Wiring
Maintenance/Inspection
Appendix
IB-P02F-P-FT settings
Control/Operation
Original notice - U1.1