37
Transfer flow chart (when using the roller for loading, and carrier wheel for discharging)
SensorAlarm A
SensorAlarm B
Signal input
PWR
STATUS
ERR
HBM-201
IB-P02F-P-FT
PWR
ERR
STATUS
24V
0V
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
NO
YES
■
The following operation is when MA/MB of IB-P02F-P-FT is set to RUN, and the transfer
direction is set to CCW.
The load and discharge directions will vary depending on the property settings and ladder
logic programming method. [Refer to 6-1-1. Switching the transfer direction on P.34
]
IB-P02F-P-FT Signal input/output
SensorAlarm A
SensorAlarm B
Signal input stop
SensorAlarm A
Signal input
RemoteOUT 2
RemoteOUT 1
Signal output
RemoteOUT 2
RemoteOUT 1
Signal output stop
F-RAT
HBM-201
OUT1/
CN2#1
OUT2/
CN2#2
INPUT1/
CN2#4
IB-P02F-P-FT
INPUT2/
CN2#5
RemoteOUT 2
RemoteOUT 1
SensorAlarm A
SensorAlarm B
M3
F-RAT
HBM-201
IB-P02F-P-FT
SensorAlarm A
SensorAlarm B
M3
OUT1/
CN2#1
OUT2/
CN2#2
A sensor to detect
the existence of
trays within the
zone.
Power
SF
BF
(
Green
)
ON
OFF
6.
Control/Operation
F-RAT-NX75 Annex User Manual for IB-P02F-P-FT
Basic operation
Turn on
the power
Load
Discharge
Set the initial
position of the
transfer surface
Transfer surface
switch
Transfer surface
switch
(
Prepare reception
)
Teaching
Term
Term
Operation to perform the initial setting of the transfer
surface position.
Teaching must be performed when the power is turned on.
Turn 24V DC on
Set the initial
position of the
transfer surface
(
Teaching
)
After the power is turned on, the LED display are indicated as below.
When preparing reception is complete, the roller surface is set on standby.
(Green) 1Hz blinking
(Orange) OFF
(Red) OFF
Power
Run in the roller
surface direction
Stop
Run in the carrier wheel
surface direction
Run in the roller
surface direction
Stop
Run in the carrier wheel
surface direction
F-RAT zone sensor
Transfer surface
switch
F-RAT operation
Turn on the
power
Start the
transfer surface
switch operation
Stop the
transfer surface
switch operation
*
The roller surface is
set in the initial position.
Transfer surface
setting complete
( )
Zone sensor
Advanced preparation
Product check
Wiring
Maintenance/Inspection
Appendix
IB-P02F-P-FT settings
Control/Operation
Original notice - U1.1
OFF