SCREEN BLINDS
125
SCREEN ZIP ECONOMY
Assembly
The main activities include:
1) preparation of walls, ceilings, windows or other structures for the assembly of roller blinds while using portable drills and
screwdrivers;
2) roller blind assembly to a wall;
3) connection to power mains;
4) adjustment (of end stops / motor end switches, etc.) and testing of the roller blind.
ROLLER BLIND ASSEMBLY
Direct guide bar installation of to a wall.
ASSEMBLY OF BOX AND GUIDE BARS
Insert the guide bar to the side board pin. No screws are necessary. When inserting, slide the ZIP to the guide socket.
1
VARIANTA 1
VARIANTA 1
VARIANTA 2
VARIANTA 2
2
2
3
4
4
Connect guiding channels with box.
Place and screw the roller blind.
Wind up the fabric as highest as possible.
Mount the plastic guiding channels.
Содержание HRS-ZIP
Страница 1: ...TECHNICAL MANUAL SCREEN BLINDS EN...
Страница 3: ...SCREEN BLINDS 3 CE Product Marking...
Страница 4: ...SCREEN BLINDS 4...