SCREEN BLINDS
118
Assembly of exterior handle with sleeve passing through wall
Handle – option with bushing (Ks)
For exterior roller blinds installed with a sleeve passing through a wall and with a handle rod in the interior, it is necessary
to calculate the exact position of the hole for a 30-cm angular rod (15).
- Attach the brackets to a wall or ceiling and install the roller blind in its place. Use a pencil to mark the position of
the box lower corner on the wall or window frame. Remove the roller blind from the brackets and measure the
distance from the box lower corner to the centre of the hole (A) in the rear part of the box (which serves for inser-
ting the angular rod to control the transmission system). Mark the same distance on the wall, thus marking the
centre of the hole to be drilled.
- Carefully drill a hole through the wall using an 8-mm drill bit. The hole must be as level as possible.
- Install the roller blind back and insert a sleeve from the interior to check accuracy of the hole position. Then cut
the angular rod to size using a hack-saw. The rod size depends on the wall thickness.
SCREEN ZIP
Assembly of handle
76
24
16
D
C
B
A
2
1
5
6
6
5
2
3
4
1
D
C
A
B
2-
2
Handle – straight option (K)
Handle with roller blind by delivery connected
Содержание HRS-ZIP
Страница 1: ...TECHNICAL MANUAL SCREEN BLINDS EN...
Страница 3: ...SCREEN BLINDS 3 CE Product Marking...
Страница 4: ...SCREEN BLINDS 4...