SCREEN BLINDS
132
SCREEN GW
Assembly
Assembly
Assembly works must be carried out solely by qualified personnel capable of adhering to all instructions stated below with
full consideration of their safety and that of all other persons.
The main activities include:
1) preparation of walls, ceilings, windows or other structures for the assembly of roller blinds while using portable drills
and screwdrivers;
2) roller blind assembly to a wall or ceiling;
3) connection to power mains;
4) adjustment (of end stops / end switches, etc.) and testing of the roller blind
Preparation of roller blind assembly
Prior to installing the roller blind, check whether the surface of the installation place is not damaged and if it is suitable for
assembly. Select suitable attachment screws (type and dimensions) corresponding to the type of structure onto which the
roller blind is to be installed (wood, cement, brick).
NOTE: Faulty assembly can lead to accidents. Observe instructions for the proper roller blind installation to prevent the risk
of separation of the roller blind from a wall or window. ISOTRA a. s. shall not be held responsible for defects caused by faul-
ty assembly.
Roller blind assembly
The method of assembly depends on the type of the roller blind:
a) Solid box with cords: first attach the box to a wall or ceiling, then tighten and fix the cords.
b) Solid box with the GC20 guide bar: first attach the box to a wall or ceiling, then attach the guide bars.
Boxes with roller blinds can be installed to a ceiling or front surfaces using special attachment brackets.
Upper box assembly
The upper box consists of three parts: side board (1), fixed part (2) and removable part (3).
If it is necessary to remove the winding drum, the access to the upper box is possible after
removing two screws (4) – one on each side – and removing the removable part of the box.
Содержание HRS-ZIP
Страница 1: ...TECHNICAL MANUAL SCREEN BLINDS EN...
Страница 3: ...SCREEN BLINDS 3 CE Product Marking...
Страница 4: ...SCREEN BLINDS 4...