SCREEN BLINDS
136
SCREEN GW
Assembly
Assembly of cords in roller blinds with boxes
Steel cords Ø 4 mm are supplied cut to length with a pre-pressed threaded end piece. The exact
cord configuration may vary per specific projects. After attaching the upper box, pass the cord
through the attachment roller on the side board and secure with a bolt.
Lower brackets can be installed on the side or front,
while the angle section aims down (a) or up (b).
Note: The places for the assembly of the brackets must
be selected before ordering the roller blinds, as this po-
sition determines the cord length.
If brackets are installed upwards (b), leave at least 20
mm of space between the bracket and the floor or
window sill.
Attach the brackets to the wall using screws and components suitable for the type of structure onto which they are to be
attached (metallic structure, cement, brick, etc.). If necessary, increase the bracket distance from the wall by washers. Always
tighten the cord and hold it to prevent twisting.
NOTE
Check parallelism and rectangularity of the four attachment points. This can be done by measuring two distances “S1” and
“S2” or diagonals “D1” and “D2”. The dimensions must be the same ±1 mm.
Содержание HRS-ZIP
Страница 1: ...TECHNICAL MANUAL SCREEN BLINDS EN...
Страница 3: ...SCREEN BLINDS 3 CE Product Marking...
Страница 4: ...SCREEN BLINDS 4...