Intel
®
Modular Server System Service Guide
19
Warning:
If using the handles during rack installation, the rear handles must be removed prior to
setting the system on the rack rails to avoid interference of the handles with the rack. The
front handles must also be removed before sliding the system completely into the rack and
securing the front chassis tabs to the rack.
Mounting System in Rack
Please read the safety information at the beginning of this book before installing the
chassis in a rack.
Warning:
If you have installed temporary handles to aid in moving and/or configuring the system,
you must remove the rear handles prior to setting the system on the rack rails to avoid
interference of the handles with the rack. The front handles must also be removed before
sliding the system completely into the rack and securing the front chassis tabs to the rack.
1. Review the safety and ESD information at the beginning of this manual and in the
appendices.
2. Identify the location within the rack where the server system is to be installed.
3. Install the rack mount rails as described in the rail installation instructions.
4. Remove the compute modules, hard drives, power supply modules, I/O modules, and
cooling modules.
5. Working with at least two people, slide the server system into the rack so that it rests
on the rack mounting rails.
6. Secure the server system in the rack as described in the rail installation instructions.
7. Install all compute modules, hard drives, power supply modules, I/O modules, and
cooling modules.
Hot-Swap Module Installation and Removal Guidelines
•
The green color on components and labels in your chassis identifies hot-swap
components. You can install or remove hot-swap modules and hot-plug compute
modules, with some restrictions, while the server system is powered on.
•
You do not need to disconnect the server system from power to install or replace any
of the hot-swap modules; however, to avoid data corruption, you must shut down the
operating system and power off the compute module before removing it from the
server system.
•
Hot-swap cooling modules must be replaced within one minute. All other hot-swap
and hot-plug components must be replaced within two minutes. Compute modules,
management modules, switch modules, storage control modules, power modules, and
cooling modules should be replaced with a like component or a filler panel within two
minutes.
Содержание MFSYS25V2
Страница 4: ...iv Intel Modular Server System Service Guide ...
Страница 14: ...xiv Intel Modular Server System Service Guide ...
Страница 16: ...xvi Intel Modular Server System Service Guide ...
Страница 82: ...66 Intel Modular Server System Service Guide ...
Страница 137: ...Intel Modular Server System Service Guide 121 Figure 71 Storage Layout Graphical View ...
Страница 143: ...Intel Modular Server System Service Guide 127 Figure 77 Diagnostic Tests Figure 78 System Information Report Download ...
Страница 144: ...128 Intel Modular Server System Service Guide Figure 79 System Information Report ...
Страница 157: ...Intel Modular Server System Service Guide 141 Figure 91 Settings Event Policies Configuration Screen ...
Страница 172: ...156 Intel Modular Server System Service Guide ...
Страница 186: ...170 Intel Modular Server System Service Guide ...
Страница 198: ...182 Intel Modular Server System Service Guide ...