6. From the rear of the rack, push the NAS against the previously installed
retainer. Install two retainers
«J¬
under the upper plate
«G¬
in order to maintain
the NAS. Secure them using screws
«H¬
.
7. Install the brackets for the display (see Figure 1-9 on page 1-8 for bracket
location).
8. Slide the display into the rack and secure it with screws
«B¬
(see Figure 5-11
on page 5-12).
Figure 5-10. NAS and Upper Plate Installation
Chapter 5. Nways Switch Administration Station FRU and Display Exchange Procedures
5-11
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......