6. ____ From the front of the rack, install the upper plate
«G¬
(PN 42L2851) into
the rack. The rear part of the upper plate must be on the top of the support
«D¬
previously installed.
7. ____ Secure the upper plate
«G¬
on the front of the rack with screws
«E¬
(PN
43G3084), and on the support
«D¬
with 8-mm M4 screws
«H¬
(see Figure 1-12
on page 1-10).
8. ____ On the front of the rack, install a retainer
«J¬
(PN 42L2853) under the
upper plate
«G¬
using the screws
«H¬
.
9. ____ From the rear of the rack. Push the NAS against the retainer previously
installed. Install two retainers
«J¬
under the upper plate
«G¬
in order to maintain
the NAS. Secure them using screws
«H¬
(see Figure 1-15).
Figure 1-15. Installing the Retainers to Secure the NAS in a 37U rack (Earthquake)
Installing the NAS and Its Modem
1-12
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......