2. ____ Install the captive nuts on the rack for installing the NAS and the display.
See Figure 1-9 for the front and rear rack location, and Figure 1-11 on page 1-9
for installation.
28
25
25
Figure 1-9. Brackets and Captive Nuts Positioning for the NAS with Earthquake Feature
1
2
Figure 1-10. Brackets Installation
Installing the NAS and Its Modem
1-8
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......