Display Exchange (Earthquake Feature)
Display Removal
1. Remove the front cover plate by unscrewing the two screws
«A¬
.
2. Switch off the display using the power ON/OFF switch located under the front
panel.
3. Disconnect the power plug of the display from the ac power source.
4. At the rear of the Nways Switch administration station, disconnect the display
cable
«L¬
.
5. At the front of the Nways Switch administration station, remove the four screws
«B¬
.
Display
Power ON/OFF
Switch
A
Figure 6-9. Display Power ON/OFF Switch
L
Figure 6-10. Display Cable Installation
6-8
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......