Nways Switch Administration Station FRU Exchange
Before any FRU exchange from the Nways Switch administration station you must
remove the Nways Switch administration station from the rack following the above
procedure.
Nways Switch Administration Station Removal from the Rack
1. Power off the display and the Nways Switch administration station using their
respective power ON/OFF switches located on the front panels.
2. At the rear of the Nways Switch administration station disconnect all the cables.
CAUTION
Be careful, the weight of the Nways Switch administration station is about
16 kg (35.3 lb).
3. If the Nways Switch administration station is installed:
v
On a table go to “FRU Exchange” on page 5-8.
v
In a 29U rack:
– If you have the earthquake feature installed, go to “NAS Removal From
the 29U Rack (Earthquake Feature)” on page 5-6.
– If you do not have the earthquake feature, go to “NAS Removal From the
29U Rack (Standard)” on page 5-6.
v
In a 37U rack:
– If you have the earthquake feature installed, go to “NAS Removal From
the 37U Rack (Earthquake Feature)” on page 5-3.
– If you do not have the earthquake feature, go to “NAS Removal from the
37U Rack (Standard)” on page 5-3.
Figure 5-1. NAS Cables Connection
5-2
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......