– On the next window, select the Save Configuration option, then press the Enter
key.
– On the next window, select the Quit Config option, then press the Enter key.
– The following window appears.
Press 'X' to Confirm Exit,
Press 'C' to Continue
– Press the X key to return to the Nways Switch Desktop window.
– Problem solved. Return the Nways Switch administration station to the customer.
Call the Network Support Center to inform them, follow their instructions, then go
to “Leaving Procedure” on page 5-30.
MAP 0510 (continued)
5-20
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......