Chapter 6. Display Exchange
If you have an earthquake feature for the display go to “Display Exchange
(Earthquake Feature)” on page 6-8. Otherwise, continue with “Display Exchange
(Standard)”.
Display Exchange (Standard)
1. Switch off the display using the power ON/OFF switch located on the front
panel.
2. Disconnect the power plug of the display from the electrical outlet.
3. At the rear of the NAS disconnect the display cable
«L¬
(see Figure 6-1).
4. If the display is installed:
v
On a table, go to step 5.
v
In a 37U rack, go to “Display Removal in 37U Rack” on page 6-2.
v
On top of 29U rack, go to “Display Removal on Top of 29U Rack” on
page 6-3.
5. Exchange the display, then go to “Display Install on a Table”.
Display Install on a Table
1. Unpack the display and install it on the table.
2. At the rear of the Nways Switch administration station, connect the display
signal cable
«L¬
(see Figure 6-1).
3. Connect the display power cable to the electrical outlet.
4. Switch on the display using the power ON/OFF switch located on the front
panel.
5. Check that your display is working.
6. Go to “Leaving Procedure” on page 5-30.
L
Figure 6-1. Display Connection to the NAS
© Copyright IBM Corp. 1998, 2000
6-1
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......