Did you find the problem?
Yes
No
025
Go to Step 027.
026
Problem solved. Call the Network Support Center to inform them, follow their
instructions, then go to “Ending the Exchange Procedure” on page 5-30.
027
– Inform your customer that for your investigation you will have to power off the
Nways Switch administration station.
– On the Nways Switch administration station front panel turn the power off. Wait
five seconds and turn it on.
– Wait until the end of the self test and IML.
Is the IML complete with the Nways Switch desktop window displayed?
Yes
No
028
Restart problem determination. Go to Step 001 on page 4-2.
029
Are the track ball and the keyboard operational?
Yes
No
030
Go to
IBM Personal Computer 300 Series, 700 Series, IntelliStation;
Hardware Maintenance Manual
, S83G-7789 to identify the problem. If you
have to exchange a FRU, go to Chapter 5. Nways Switch Administration
Station FRU and Display Exchange Procedures.
031
Problem solved. Call the Network Support Center to inform them, follow their
instructions, then go to “Ending the Exchange Procedure” on page 5-30.
MAP 0400 (continued)
4-6
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......