Installing the NAS in a 37U Rack
1. ____ Unpack the keyboard and the mouse, open the service drawer
«J¬
, and
install the keyboard
«K¬
in the drawer as shown in Figure 1-4. Put the mouse
«H¬
on the plate located in front of the keyboard.
2. If you have to install the NAS:
v
Without the earthquake feature, go to “NAS Installation into a 37U Rack
(Standard)” on page 1-6.
v
With the earthquake feature, go to “NAS Installation into a 37U Rack
(Earthquake Feature)” on page 1-7.
J
K
H
Figure 1-4. Keyboard Installation in 37U Rack
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
1-5
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......