Installing the Display on Top of the 29U Rack
1. ____ On the top of the 29U rack, loosen and remove the six screws
«A¬
(see
Figure 1-28).
2. ____ Remove the top cover
«B¬
.
3. ____ Unpack the display and install it on the top of the 29U rack using the
following steps:
CAUTION
Be careful, the weight of the display is about 15 kg (33 lb).
a. ____ On the top of the 29U rack install the safety retainers
«D¬
(PN
02N1503) with screws
«F¬
(PN 1621601) and star washers
«E¬
(PN
1622336), see Figure 1-29 on page 1-24.
A
C
B
Figure 1-28. Removing of the Top Cover
Installing the NAS and Its Modem
Chapter 1. Installing and Configuring the NAS and Its Modem
1-23
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......