c. Put the display in place (near the front of the machine).
d. Once the display is in place, secure it by tightening the screws
«F¬
.
3. Route the display power and signal cables through the top opening.
4. Reinstall the top cover
«B¬
(see Figure 6-4 on page 6-3). Be sure that the signal
and power display cables are correctly routed in the top aperture
«C¬
. Secure
the top cover with the screws
«A¬
previously removed.
5. At the rear of the Nways Switch administration station, connect the display
signal cable
«L¬
(see Figure 6-8 on page 6-7).
D
D
F
Figure 6-7. Display Installation on Top of 29U Rack
6-6
2220 Setup and Service Guide
Содержание xSeries 300
Страница 2: ......
Страница 9: ...Tables 1 1 Telecommunication Cables 1 31 Copyright IBM Corp 1998 2000 vii ...
Страница 10: ...viii 2220 Setup and Service Guide ...
Страница 14: ...xii 2220 Setup and Service Guide ...
Страница 66: ...Figure 3 4 Example of PM Ping Results 3 8 2220 Setup and Service Guide ...
Страница 67: ...Chapter 4 Nways Switch Administration Station Problem Determination Copyright IBM Corp 1998 2000 4 1 ...
Страница 82: ...4 16 2220 Setup and Service Guide ...
Страница 142: ...B 10 2220 Setup and Service Guide ...
Страница 144: ...C 2 2220 Setup and Service Guide ...
Страница 146: ...D 2 2220 Setup and Service Guide ...
Страница 156: ...E 10 2220 Setup and Service Guide ...
Страница 159: ......